Thursday, December 6, 2012
Wednesday, December 5, 2012
24 Hour Countdown!
This time tomorrow we'll be about to start demo day! Here's our to do list for today. Shouldn't be too bad
TO DO:
[Completed
In progress]
MECHANICAL
·
Wooden Box for the water pump box
· Plastic
cover for the water pump
· Latch
on spout system
· Tube
system from spout to water tank
ELECTRICAL
· LEDs
super glued into holes
·
Longer leads on short guy purple LED
·
Leads into Leaf
(mostly)
SOFTWARE
· Code
for our demo day, agreed upon yesterday
· One
more look into button pressing finickyness
OTHER
·
(Sam) Print out settings guide/create
account
·
(Sam) Pick up seeds to hand out to the class
·
(Gracie) Pick up watering
can
Tuesday, December 4, 2012
2 days left!
It's crunch time! Today we worked for a long time on integrating everything. I've been spending lots of time in the machine shop trying to line up holes for the housing and it's finally together! We have some adjustments to make tomorrow to make it look better. Today we tested it with our water tank and our tank sensor and surprisingly everything integrated nicely.
SLEEEEEEEEPPPP!
SLEEEEEEEEPPPP!
Think Outside the Box
It's been a PoE marathon this past week so i'm going to split this into a few different posts. First, the box! We had it laser cut last week and then we got to assemble this week. First, we had fun experimenting with wood glue and we ended up clamping our box by wrapping the whole thing in orange string. Next, we tried our hand at polyurethane even though we were terrified to ruin our box. It all worked out though and now we have a beautiful box! Next, we put LED's and buttons in our box. We have 3 turquoise, 3 purple, 2 green, a yellow, and red. We also have a hinged door that holds the tubing to refill the box (that has yet to be installed yet though). Here is our box in various stages of completeness!
Subscribe to:
Posts (Atom)